House update

Unlike K's adoption (still no news, or any idea why it is taking so long), the house project is running on schedule...maybe even ahead. The wood floors are in and stained, the drywall is up and primed, and tile starts on Monday. Here are some pictures:




This is the kitchen, looking east and south. The sink will be under the east window (staight ahead). You can't tell that the floors are done because they've been covered-up to protect them.



This is the north wall of the kitchen, opposite the above picture. The opening on the right goes into the mud room, the opening in the middle (with the ladder) will be the refridgerator, and the opening on the left will be the walk-in pantry.



This is the view of the other end of the kitchen (looking west). The door leads out to a side deck. A desk will be under the window, and I'm not sure what we're doing along the wall. The doorway on the right leads to the butler's pantry:



And (because I forgot to post it earlier), what does it look like when two families, with twelve children between them, dye 11 dozen Easter eggs?

Comments

Anonymous said…
oh do I hope you get good news on your adoption soon.

Isn't it nice to have *something* that is under your control? The house looks great!
Stevens Family said…
Wow, your kitchen renovation is coming along nicely. I bet you can't wait till it's done.

I hope you hear good news next week to bring K. home!!
Ann said…
I love how the kitchen is coming along. Thanks for posting pictures. Can I come over for a cup of tea? It looks like a great place for getting together with friends :-)

And I can't imagine the wait you've endured for K. No words here--just prayers.

Blessings, Ann

Popular posts from this blog

Making bias tape... otherwise known as the Sew, Mama, Sew! Giveaway

Kenzie on the beach

Apple picking in the rain